Hot press sintering furnace operating procedures

Hot press sintering furnace operating procedures

In addition to the price of the hot press sintering furnace, its operating procedures should also be firmly grasped. Many people have ignored this point. Today, I will give a specific explanation in this area, so that everyone can expand and deepen on the original basis, and make themselves more The hot-pressing sintering furnace can be used correctly in practice, thereby improving its work efficiency.

  1. Check whether the circuit and waterway are normal, such as normal power and water.
  2. Turn on the mechanical pump, slowly open the pre-pump valve after 30 seconds, and open the foreline valve after 1 minute.
  3. Turn on the diffusion pump when the vacuum reaches 10Pa or less to heat the diffusion pump
  4. After the diffusion pump is heated for 60 minutes, close the pre-pump valve and open the high vacuum valve, the vacuum will gradually reach high vacuum.
  5. Heating start. Please choose manual heating below 200 degrees. In the manual operation menu of the control panel, please note that when you use it for the first time, turn the dial up and down once, then dial to the manual position to start heating, and enter about 50. determine. The current is generally controlled below 300A.

[url=https://www.vacfurnace.com/project/vacuum-oilgas-quench-furnaces-voq/]Vacuum Oil Quenching Furnace[/url]

[url=https://www.vacfurnace.com/vacuum-furnace-product/vacuum-sintering-furnace/]Vacuum Sintering Furnace[/url]

[url=https://www.antsalliance.com/]industrial vacuum pumps,vacuum furnaces[/url]

Comments

Sign In or Register to comment.